Harper Ward Well Update: August 23, 2021

The drillers have finished the test well and have left the well site.  The test well was drilled to a depth of 800′ but due to poor water quality at the deeper depths, was later filled in to 393′.  The drillers test pumped the well at 50 GPM with no drawdown and the current water …

Read more

Harper Ward Well Update: July 22, 2021

Drilling began on the Harper Ward well on July 19, 2021.  This is a 6-inch test well.  It will have a maximum depth of 800 feet.  Drilling should take up to 3 weeks.

Flat Canyon Well Drilling Update 10/18/2019

Currently, the Flat Canyon Well is approximately 642 feet deep.  It was drilled with a 14 ¾ – inch tricone bit with a rotary drill circulating bentonite mud in order to keep the hole open.  Bedrock was encountered at approximately 625 feet deep, with sand and gravel above that.   Based on our seismic testing, …

Read more

Getting Ready to Drill

The rig is in place and the drilling should begin Oct 3, 2019.

Sept 30th Update

Driller has begun to mobilize his equipment. Due to the heavy rain over the weekend, there has been some damage to the access road and well pad. This is being fixed. It is anticipated that drilling will begin as early as Wednesday, October 2. Stay tuned for more project updates.

Status of Deweyville Flat Canyon Well

BRWCD has been approved by the Division of Water Rights to drill a test well in Deweyville, UT before developing a culinary source of water under approved Water Right 29-4020. We intend to drill a 6-inch test well to a depth of approximately 1100 feet at the mouth of Flat Canyon.  A 75 ft. x …

Read more