Master Plan / Projects

Click here to view the full Master Plan PDF.


00 00 30 – Inv to Bid – Test Well – Final

BRWCD – Deweyville Test Well Specs

Test Well Bid Results


Current Project Updates

Flat Canyon Well Drilling Update 10/18/2019

Currently, the Flat Canyon Well is approximately 642 feet deep.  It was drilled with a 14 ¾ – inch tricone bit with a rotary drill circulating bentonite mud in order to keep the hole open.  Bedrock was encountered at approximately 625 feet deep, with sand and gravel above that.   Based on our seismic testing, …

Read moreFlat Canyon Well Drilling Update 10/18/2019

Posted in Current Projects, Flat Canyon Well Project | Leave a comment

Getting Ready to Drill

The rig is in place and the drilling should begin Oct 3, 2019.

Posted in Current Projects, Flat Canyon Well Project | Leave a comment

Sept 30th Update

Driller has begun to mobilize his equipment. Due to the heavy rain over the weekend, there has been some damage to the access road and well pad. This is being fixed. It is anticipated that drilling will begin as early as Wednesday, October 2. Stay tuned for more project updates.

Posted in Current Projects, Flat Canyon Well Project | Leave a comment

Status of Deweyville Flat Canyon Well

BRWCD has been approved by the Division of Water Rights to drill a test well in Deweyville, UT before developing a culinary source of water under approved Water Right 29-4020. We intend to drill a 6-inch test well to a depth of approximately 1100 feet at the mouth of Flat Canyon.  A 75 ft. x …

Read moreStatus of Deweyville Flat Canyon Well