Harper Ward Well Update: August 23, 2021

The drillers have finished the test well and have left the well site.  The test well was drilled to a depth of 800′ but due to poor water quality at the deeper depths, was later filled in to 393′.  The drillers test pumped the well at 50 GPM with no drawdown and the current water …

Read more