Harper Ward Well Update: August 23, 2021

The drillers have finished the test well and have left the well site.  The test well was drilled to a depth of 800′ but due to poor water quality at the deeper depths, was later filled in to 393′.  The drillers test pumped the well at 50 GPM with no drawdown and the current water …

Read more

Harper Ward Well Update: July 22, 2021

Drilling began on the Harper Ward well on July 19, 2021.  This is a 6-inch test well.  It will have a maximum depth of 800 feet.  Drilling should take up to 3 weeks.

Flat Canyon Well Update: June/July 2021

Development began on the Flat Canyon well on June 24, 2021.  So far, a chemical treatment has been done as well as some cable tool rig development.  Test pumping will begin on July 26, 2021. Click here to view the updated well reports from June 24 – July 15, 2021.